Can we cut and weld special steel, which is difficult to obtain, in the required quantities!? Not only can we significantly reduce total costs, but we can also shorten the usual delivery time from 3-4 months to just 1 month!
Our company realizes short delivery times even for small lots of various types of steel materials due to the wide range of products we handle and our abundant inventory. We accept orders starting from one piece, including bending, drilling, milling, laser cutting, gas cutting, water jet cutting, and BTA processing.
【Processing Example】
Material: SM400A (Welded structural rolled steel)
Size: Build H H8/12×200×200×4000 (with some hole processing)
Processing Method: Laser cutting of steel plates + welding into H-shaped steel
Application: Used as structural components for civil engineering and construction, such as columns, beams, foundation piles, and machinery products.
【Benefits of Processing at Our Company】
▼ Due to the special materials, ready-made H steel is usually produced by manufacturers in units of 4 tons, 10 tons, etc.
Delivery times also take 3 to 4 months or more.
⇒ As a steel supplier, we can cut out only the necessary amount from steel plates and weld them.
This significantly reduces total costs and shortens delivery times to about one month.
▼ The processing size this time is small within the Build H range, so there are few vendors capable of handling this processing.
*For procurement of metal processed products, contact "Ito Akira Sangyo"!
- Company:伊藤彰産業
- Price:Other